Roof Cricket Slope Roof Hugh Point
Otherwise the effective slope of the cricket would be compromised by the difference between these two dimensions so as to maintain the 2 4 m 8 ft requirement at the cricket s highest point.
Roof cricket slope roof hugh point. On the roof plan below. Assuming that the remaining roof surfaces slope at 3 8 per foot 1 32 label the roof high points. This design is accepted as good roofing practice among industry professionals with the. Once the primary slope is created crickets are installed both between drains and between the end of the building and the drain to direct water to the outlets.
See figure 1 for the ranges of manufacturers acceptable duration policies for ponding for various roof system types. Complete the roof drainage plan below taken from exercise 11 2 showing roof drains crickets directions of slopes magnitudes of slopes and roof high points. A dead level surface with a low point that is in a drain line. Modify the roof plan so that the slope of the cricket matches the typical slope of the roof.
The slope goes from that point to a high point either at the roof perimeter or at a point between two drain lines. The low point or narrowest portion of the cricket must be 0 3 m. Conventional roofs are the easiest to construct and you can walk on them safely. Add arrows indicating slope.
Smaller crickets are covered with metal flashing and larger ones can be covered with the same material as the rest of the roof. Assuming that the high point on the central cricket is 6 2 5 160 mm above the drain level what is the slope of the cricket. Assuming a slope of 1 4 per foot 1 48 label roof high points. Ommend a roof assembly have positive slope to drain and allow for short durations of ponding water.
You can also calculate roof pitch even without using a roof slope calculator. Once the primary slope is created crickets are installed both between drains and between the end of the building and the drain to direct water to the outlets. They have a pitch ranging from 4 12 to 9 12. Assuming the high point on the central cricket is 6 25 160 mm above the drain level what is the slope of the cricket.
The picture below shows the pitch of a 7 12 roof slope meaning that for 12 of horizontal measurement roof run the vertical measurement roof rise is 7. High pitched roofs often need extra fasteners and their pitch can be as high as 21 12. The slope goes from that point to a high point either at the roof perimeter or at a point between two drain lines. Providing positive slope many components contribute to a roof system s slope and some elements are outside your responsibility.
Ad d arrows indicating slope. This measurement is best done on a bare roof because curled up roofing shingles will impair your measurement. If this isn t practical then perform the same measurement on the underside of.